1.05 million bridges are aging en masse, yet monitoring coverage for 880,000 small and medium-sized bridges remains below 1%. With the 2030 policy of full coverage for national and provincial highways looming, implementation is stalled due to high costs, significant damage, and difficulties in practical deployment. SPEPC Visual Intelligent Deformation Monitor—non-contact, sub-millimeter precision, and non-invasive to bridge structures—offers a lightweight monitoring solution for millions of bridges.

 

First, let’s look at a set of figures worth noting:

1.05 million seats

Total number of highway bridges nationwide

84%

The proportion of small and medium-span bridges

80%

Proportion of bridges that have been in service for over 20 years and have entered a period of high disease incidence.

0.57%

Automation monitoring coverage rate for small and medium-sized bridges

30 billion+

During the 15th Five-Year Plan period, there is a market gap in the monitoring of small and medium-sized bridges.

     

Millions of bridges are aging en masse, yet monitoring has failed to keep pace.


 

01 The bridge monitoring industry has undergone a major shift.

The country has hit the accelerator.

In 2024, Implementation Plan on Further Promoting Structural Monitoring of Highway Bridges and Tunnels Specific requirements:


 

By 2030, full coverage of bridge monitoring will be achieved for expressways and ordinary national highways.

The monitoring rate for key bridges on ordinary provincial roads exceeds 60%.

The industry is undergoing a fundamental transformation:

From “Specialized Monitoring for Extra-Large and Major Bridges” Turn Pan-Network Universal Monitoring


 


 

The 14th Five-Year Plan

Monitoring focuses on 1,115 long and large bridges.


 

“The Fifteenth Five-Year Plan”

The construction focus extends to approximately 300,000 to 500,000 small- and medium-span bridges.


 

Based on an estimated base configuration of RMB 100,000 per unit, this would be a… 30 to 50 billion yuan The rigid-demand market.


 

02 Traditional approaches no longer work.

In the past, intelligent bridge monitoring was severely skewed, resulting in an imbalanced landscape where large bridges were heavily equipped while smaller bridges were left largely unmonitored.

Small and medium-sized bridge monitoring has long faced a triple dilemma:


 

· The cost is too high.

Traditional wired monitoring systems start at a cost of one million yuan per unit, far exceeding the budgets allocated for the maintenance of small and medium-sized bridges.

<


 

· The damage is too great.

Construction requires drilling and grooving, as well as the installation of concealed cables, which can inflict irreversible secondary structural damage on aging bridges.

<


 

· Coverage is too difficult.

880,000 small and medium-sized bridges are scattered throughout county- and township-level road networks, and conventional solutions are entirely unsuitable for large-scale deployment.

<


 

Meanwhile, the standardization of monitoring has also been further enhanced:


 


 


 

2026.02.11

Click the image to view the file.

2026 Edition of the “Technical Condition Assessment Standard for Highway Bridges” (Draft for Approval) It has revolutionized the evaluation logic—shifting from traditional holistic scoring to precise, component-level assessment.

Even minute deformations and microcracks in a single component must be included in the risk assessment.

Quarterly manual inspections alone can no longer meet the requirements of the new standards.

03 SPEPC Solution

Facing Low cost, protective structure, continuous monitoring SPEPC’s triple wish, fulfilled in one go by Spepc Technology.

Visual Intelligence Deformation Monitor

Based on machine vision and AI algorithms, by performing high-precision positioning of targets deployed at monitoring locations, it is possible to measure the two-dimensional displacement and deformation of the target under test. Non-contact real-time measurement


 

Non-contact, no damage to the bridge.

No need to drill holes, cut grooves, or embed cables in the bridge structure—ideal for aging bridges. Zero damage
 

Install and use right away , deployed and launched on the same day.


 

High precision, accurate vision

Equipped with a high-resolution image sensor and sub-pixel positioning algorithms, it offers a maximum detection range of 400 meters with an accuracy of Submillimeter-level
 

A single device can simultaneously monitor multiple targets. , supporting large‑area, multi‑cross‑section, long‑distance, multi‑point monitoring.
 

Main girder settlement, bearing displacement, bridge tower inclination, and pier foundation offset—caused by repeated traffic loading and diurnal temperature variations. Millimeter-scale deformation , all can be accurately captured.


 

All-weather, reliable

Built-in constant-temperature control system, with temperature control accuracy reaching ±0.2℃ , effectively avoiding measurement errors caused by diurnal and seasonal temperature variations.
 

IP65 High protection rating, unafraid of complex outdoor weather conditions.


 

It provides early warnings and responds quickly.

Real-time intelligent data analysis; when displacement anomalies are detected, it automatically triggers web pop-up alerts and SMS notifications, and can be linked to on-site audio‑visual alarms.
 

From data anomaly detection to alert delivery, the entire process Minute-level response


 

04 Mature Solution

The technological prowess of the visual‑intelligence deformation monitoring instrument has been thoroughly validated across numerous transportation and structural safety monitoring applications.

Deployment Status

Railway rail displacement

Hohhot, Inner Mongolia

Railway subgrade settlement

Jiangxi, Nanchang

Settlement of Low-Resistance Support Columns of the State Grid

Anhui, Wuhu

Mine slope deformation

Yichun, Jiangxi

Highway slope deformation

Guangxi·Longsheng

Deformation of slope-cutting for housing construction

Wuzhou, Guangxi

Swipe right to view

Based on the mature experience in the aforementioned scenarios, SPEPC has developed a comprehensive deployment plan for bridge monitoring:


 


 

It’s ready and can be implemented—no waiting required.


 


 

Triple pressure

hundred The Wanqiao Bridge is aging, policy objectives are clear, and component assessments have been upgraded.

Triple Dilemma

High costs, extensive damage, and difficult to cover.

SPEPC solution, tailored to meet large-scale requirements.

Lightweight, contactless, and easy to deploy.

Spepc Technology helps you get started with ease.

Q

 Image

End-of-article interaction

In your region, what is the most challenging issue in bridge monitoring?
 

Feel free to leave a comment with “Region + Number of Bridges,” and we’ll arrange for a technical consultant to provide you with a personalized solution.

Experience it now and usher in a new era of smart connectivity!

Business Contact:

Manager Tang (Headquarters) :13677730170 (WeChat ID is the same)


 


 

Digital innovation, the Internet of Everything—Spepc Technology, building a smart future with you!


 

Click the card below to follow us and stay updated with the latest industry insights and real-world case studies👇